We partner with PPA funders to replace your old roof and install solar — at zero upfront cost to your business. You pay less for electricity from day one.
Our PPA (Power Purchase Agreement) route covers the full cost — including replacing asbestos roofs — so you get solar installed and a brand new roof at no cost.
Roof survey, system design, energy profile analysis. We confirm your site qualifies and model the savings.
Our funder covers the full installation — including asbestos roof replacement if needed. You pay nothing upfront.
Your old roof is replaced as part of the installation. You get a brand new roof and a live solar system.
You purchase the solar electricity at a rate lower than your current tariff. Guaranteed savings from day one.
Most quotes come from companies who profit from the installation. Their recommendation is their product. You deserve advice that puts your building first.
Grid connection applications through Northern Powergrid are backing up. Without someone who knows the process, your project sits in a queue for months.
Commercial solar can cost hundreds of thousands. Our PPA route eliminates that barrier entirely — the funder carries the capital risk, not you.
Full rooftop array on a large retail shopping centre. Retail environments demand consistent daytime power — this system covers a significant portion of on-site load with immediate grid-rate savings.
High-demand retail environment with 24/7 refrigeration load. Solar generation significantly offsets peak daytime consumption — Aldi's cold storage operations align perfectly with solar output profiles.
Multi-building industrial facility with substantial baseload demand. At 2MW, this is among the largest rooftop systems Rob has delivered — demonstrating capability to manage large-scale commercial projects from survey through to commissioning.
We match UK commercial buildings with PPA funders who replace the roof and install solar at zero cost. You just buy cheaper electricity.